Recently WorkSafe has seen scaffolding where damaged components and unsafe practices were used in the erection of the scaffold. These included broken connection lugs and components secured with wire. Tie wire or any other system that is not structurally rated should not be used to secure scaffolding and would be outside of the manufacturer's designer specifications.
If broken or insufficient components have been supplied contact the supplier for these parts to be replaced. Below are two examples of broken components that have been used.
Overloading of scaffolding structures (Understanding duty loadings specific to scaffolding systems). Example: Steel K Stage type scaffolding loadings rule of thumb.